Outage Coordination |
|
| All forced outages must be reported to the California ISO with a description of the cause and all remedial actions taken. |
Outage Reporting Requirements and Technical Documentation |
|
Generating Unit Outage Reporting Compliance pdf 88K | Abstract | 08/06/2008 08:28 |
|
Forced Outage Reporting Requirements doc 724K | Abstract | 06/21/2010 15:32 |
|
Generating Unit Forced Outage Reporting Using RTAM pdf 933K | Abstract | 04/16/2007 11:22 |
|
SLIC RTAM Interim User Interface Guide pdf 940K | Abstract | 07/30/2007 13:48 |
|
SLIC Web Service API Guide pdf 255K | Abstract | 04/10/2007 15:10 |
|
|
|
SLIC Web Client / API Accurate and complete outage scheduling is vital to reliable operation of the transmission system. SLIC (Scheduling and Logging for the ISO of California) is a web-enabled interface for transmission and generation owners to communicate outage information to the California ISO. |
|
Transmission Outage Reports All transmission outages must be reported to the California ISO with a description of the cause and all remedial actions taken. Information is confidential. Access requires a valid California ISO user certificate. |
|
Curtailed and Non-Operational Generators Daily snap-shot of California power plants that are not operational due to planned or unplanned outages. Please note that reported conditions are dynamic and subject to change without further notice. |