Scheduling |
|
| Scheduling Coordinator (SC) Certification |
| Interchange Scheduling and Tagging |
| Scheduling and Bidding Guidelines |
|
Scheduling Infrastructure To participate in California ISO markets, Scheduling Coordinators submit energy schedules and bids for Ancillary Services and Supplemental Energy. Scheduling Guidelines are available along with training and technical information regarding the California ISO Scheduling Infrastructure (SI) application. |
|
Transmission Scheduling |
|
Firm Transmission Rights (FTR) Firm Transmission Rights (FTRs) are transmission rights acquired through an annual auction that have both a scheduling and financial aspect. These rights are acquired using the zonal model used prior to implementation of MRTU. FTRs will be replaced with CRRs with MRTU implementation. |
|
Capacity Benefit Margins (CBM) Reports Capacity Benefit Margins (CBM) are reserved by the CAISO in the Day Ahead Market to ensure the availability of adequate transmission capacity to serve CAISO native load. |
